- Assets
- 155of 157 records
- Top-100 mean
- 13.46of 25
- Scoring a full 25
- 0
- Leading group
- 21%Energy
Where the top 100 are82 located
A larger circle is a higher score. A fainter one marks the place an asset is in, or a point standing for a network, not the asset's own site.
The shape of the register
How the nation's strategic weight and its assets are spread across the ten capability groups, and how its scores are distributed.
Signature
Each capability group's share of the score carried by the nation's 200 highest-scoring assets.
Social
Transport
Energy
Communications & Digital
Financial
Advanced Manufacturing
Space, Aerospace & Defence
Water, Sanitation & Waste
Agriculture & Food
Resource
26.2%
18.0%
17.6%
8.4%
8.1%
7.5%
4.7%
3.9%
3.6%
2.1%
Assets by capability group
Every discrete asset on the register, and how many of each group reach the national top 100.
Score distribution
The number of assets at each score from 0 to 25.
Source National Infrastructure Index, Strategic Infrastructure schema v1.1. An asset's score is the sum of five dimensions, each judged from 0 to 5; individual scores are approximate.
Not yet or no longer operating: 9 under construction, 9 planned, 1 decommissioned.
National top 100
Every asset competes on its score, with no quota by sector. The five dimensions are each judged from 0 to 5.
| # | Asset | Flow | Reach | Centrality | Substitutability | Throughput | Score | Confidence |
|---|---|---|---|---|---|---|---|---|
| 1 | Bhutan Power Corporation national transmission grid and Indian interconnectorsEnergy ยท Transmission & Distribution ยท Nationwide and southern border | 5 | 4 | 5 | 4 | 2 | 20 | medium |
| 2 | Phuentsholing land border gateway and dry portTransport ยท Logistics, Multimodal & Border Infrastructure ยท Phuentsholing, Chukha District | 5 | 4 | 5 | 4 | 2 | 20 | medium |
| 3 | Royal Monetary Authority foreign exchange reservesFinancial ยท Currency & Reserves ยท Thimphu | 5 | 4 | 4 | 5 | 2 | 20 | high |
| 4 | Paro International AirportTransport ยท Air Infrastructure ยท Paro District | 4 | 4 | 5 | 5 | 1 | 19 | high |
| 5 | Thimphu-Phuentsholing Highway (Asian Highway 48 section)Transport ยท Roads & Bridges ยท Thimphu to Phuentsholing | 4 | 4 | 5 | 4 | 1 | 18 | high |
| 6 | Bhutan Telecom national network and internet gatewayCommunications & Digital ยท Core & Backbone Networks ยท Nationwide, core in Thimphu | 4 | 4 | 5 | 4 | 1 | 18 | medium |
| 7 | Punatsangchhu-II Hydroelectric ProjectEnergy ยท Hydropower ยท Wangdue Phodrang District | 4 | 4 | 4 | 4 | 2 | 18 | high |
| 8 | Tala Hydroelectric Power PlantEnergy ยท Hydropower ยท Wangdue, Chukha District | 4 | 4 | 4 | 4 | 2 | 18 | high |
| 9 | National Load Despatch CentreEnergy ยท System Control & Dispatch ยท Thimphu | 4 | 4 | 4 | 4 | 2 | 18 | medium |
| 10 | Royal Monetary Authority of Bhutan headquartersFinancial ยท Currency & Reserves ยท Thimphu | 4 | 4 | 4 | 4 | 1 | 17 | high |
| 11 | Tashichho Dzong, ThimphuSocial ยท Government & Public Administration ยท Thimphu | 4 | 4 | 4 | 4 | 1 | 17 | high |
| 12 | East-West (Lateral) National HighwayTransport ยท Roads & Bridges ยท Phuentsholing to Trashigang via Thimphu | 4 | 4 | 4 | 4 | 1 | 17 | high |
| 13 | Mangdechhu Hydroelectric PlantEnergy ยท Hydropower ยท Trongsa District | 4 | 4 | 4 | 3 | 2 | 17 | high |
| 14 | Bank of BhutanFinancial ยท Banks, Insurers & Systemic Institutions ยท Phuentsholing | 4 | 4 | 4 | 3 | 2 | 17 | high |
| 15 | Bhutan Financial SwitchFinancial ยท Payments & Settlement Systems ยท Thimphu | 3 | 4 | 4 | 4 | 1 | 16 | medium |
| 16 | Department of Civil Registration and Census population registerCommunications & Digital ยท Data Resources ยท Thimphu | 3 | 4 | 4 | 4 | 1 | 16 | medium |
| 17 | National Centre for Hydrology and MeteorologySocial ยท Hydrometeorology & Early Warning ยท Thimphu | 4 | 4 | 3 | 4 | 1 | 16 | high |
| 18 | Paro air traffic control tower and approach unitTransport ยท Air Navigation & Traffic Management ยท Paro | 4 | 4 | 3 | 4 | 1 | 16 | medium |
| 19 | Dorjilung Hydroelectric Projectunder constructionEnergy ยท Hydropower ยท Gongri | 3 | 4 | 3 | 3 | 3 | 16 | medium |
| 20 | Kholongchhu Hydroelectric Projectunder constructionEnergy ยท Hydropower ยท Doksum | 3 | 4 | 3 | 3 | 3 | 16 | medium |
| 21 | Bhutan National Digital Identity and Government Data Centre, ThimphuCommunications & Digital ยท Data Centres, Compute & Cloud ยท Thimphu | 3 | 4 | 4 | 3 | 1 | 15 | medium |
| 22 | Samdrup Jongkhar to Trashigang HighwayTransport ยท Roads & Bridges ยท Samdrup Jongkhar | 3 | 3 | 3 | 4 | 2 | 15 | high |
| 23 | Punatsangchhu-I Hydroelectric Projectunder constructionEnergy ยท Hydropower ยท Wangdue Phodrang District | 3 | 4 | 3 | 4 | 1 | 15 | high |
| 24 | Jigme Dorji Wangchuck National Referral HospitalSocial ยท Health Infrastructure ยท Thimphu | 3 | 4 | 3 | 4 | 1 | 15 | high |
| 25 | Royal Centre for Disease ControlSocial ยท Public Health & Laboratories ยท Serbithang | 3 | 4 | 3 | 4 | 1 | 15 | high |