- Assets
- 187of 190 records
- Top-100 mean
- 14.41of 25
- Scoring a full 25
- 0
- Leading group
- 28%Transport
Where the top 100 are84 located
A larger circle is a higher score. A fainter one marks the place an asset is in, or a point standing for a network, not the asset's own site.
The shape of the register
How the nation's strategic weight and its assets are spread across the ten capability groups, and how its scores are distributed.
Signature
Each capability group's share of the score carried by the nation's 200 highest-scoring assets.
Social
Transport
Energy
Water, Sanitation & Waste
Communications & Digital
Financial
Agriculture & Food
Advanced Manufacturing
Space, Aerospace & Defence
Resource
30.3%
25.0%
10.4%
7.7%
7.0%
6.5%
4.6%
4.5%
2.9%
1.3%
Assets by capability group
Every discrete asset on the register, and how many of each group reach the national top 100.
Score distribution
The number of assets at each score from 0 to 25.
Source National Infrastructure Index, Strategic Infrastructure schema v1.1. An asset's score is the sum of five dimensions, each judged from 0 to 5; individual scores are approximate.
Not yet or no longer operating: 5 under construction, 1 decommissioned, 1 damaged or idle, 2 inactive.
National top 100
Every asset competes on its score, with no quota by sector. The five dimensions are each judged from 0 to 5.
| # | Asset | Flow | Reach | Centrality | Substitutability | Throughput | Score | Confidence |
|---|---|---|---|---|---|---|---|---|
| 1 | Sihanoukville Autonomous PortTransport ยท Seaports & Terminals ยท Sihanoukville, Preah Sihanouk | 5 | 4 | 5 | 4 | 3 | 21 | high |
| 2 | Techo International AirportTransport ยท Air Infrastructure ยท Kandal Steung, Kandal | 4 | 4 | 4 | 4 | 3 | 19 | high |
| 3 | National Bank of Cambodia HeadquartersFinancial ยท Currency & Reserves ยท Phnom Penh | 4 | 4 | 4 | 4 | 2 | 18 | high |
| 4 | Tsubasa BridgeTransport ยท Roads & Bridges ยท Neak Loeung | 4 | 4 | 4 | 4 | 2 | 18 | high |
| 5 | Cambodia Air Traffic Services Phnom Penh Area Control CentreTransport ยท Air Navigation & Traffic Management ยท Phnom Penh | 4 | 4 | 4 | 4 | 2 | 18 | medium |
| 6 | Bavet-Moc Bai Border Crossing and Logistics ComplexTransport ยท Logistics, Multimodal & Border Infrastructure ยท Bavet, Svay Rieng | 4 | 4 | 4 | 3 | 3 | 18 | high |
| 7 | National Road 1 Phnom Penh to BavetTransport ยท Roads & Bridges ยท Phnom Penh to Bavet | 4 | 4 | 4 | 3 | 3 | 18 | high |
| 8 | Lower Sesan II Hydropower DamEnergy ยท Hydropower ยท Stung Treng | 4 | 3 | 4 | 4 | 2 | 17 | high |
| 9 | Electricite du Cambodge National Control CentreEnergy ยท System Control & Dispatch ยท Phnom Penh | 4 | 4 | 4 | 4 | 1 | 17 | medium |
| 10 | Phnom Penh Autonomous Port (LM17 container terminal)Transport ยท Inland Waterways & Ferries ยท Phnom Penh | 4 | 3 | 4 | 3 | 3 | 17 | high |
| 11 | Phnom Penh-Sihanoukville ExpresswayTransport ยท Roads & Bridges ยท Phnom Penh to Preah Sihanouk | 4 | 3 | 4 | 3 | 3 | 17 | high |
| 12 | CIIDG Erdos Hongjun Coal Power Plant, SihanoukvilleEnergy ยท Thermal Generation ยท Stung Hav, Preah Sihanouk | 4 | 3 | 4 | 3 | 3 | 17 | medium |
| 13 | Bakong Payment SystemFinancial ยท Payments & Settlement Systems ยท Phnom Penh | 4 | 4 | 4 | 3 | 2 | 17 | high |
| 14 | Cambodia Fiber Optic Communication NetworkCommunications & Digital ยท Core & Backbone Networks ยท nationwide from Phnom Penh | 4 | 4 | 4 | 3 | 2 | 17 | high |
| 15 | Cambodia-Vietnam 230 kV InterconnectorEnergy ยท Transmission & Distribution ยท Takeo/Svay Rieng to Vietnam | 4 | 4 | 4 | 3 | 2 | 17 | medium |
| 16 | Smart Axiata Mobile Core NetworkCommunications & Digital ยท Core & Backbone Networks ยท Nationwide | 3 | 4 | 4 | 3 | 3 | 17 | high |
| 17 | Metfone Mobile NetworkCommunications & Digital ยท Mobile & Wireless Networks ยท Phnom Penh | 4 | 4 | 4 | 2 | 3 | 17 | high |
| 18 | Sihanoukville Oil Storage and Import TerminalEnergy ยท Storage & Fuel Supply ยท Preah Sihanouk | 4 | 4 | 3 | 3 | 3 | 17 | low |
| 19 | Sihanoukville Cable Landing Station (MCT Cable)Communications & Digital ยท Subsea Cables & International Gateways ยท Sihanoukville | 4 | 5 | 3 | 3 | 2 | 17 | medium |
| 20 | Phnom Penh Water Supply Authority Chamkar Mon and Niroth PlantsWater, Sanitation & Waste ยท Water Supply & Treatment ยท Phnom Penh | 4 | 2 | 4 | 4 | 2 | 16 | high |
| 21 | Ream Naval BaseSpace, Aerospace & Defence ยท Military Bases & Installations ยท Preah Sihanouk | 3 | 4 | 4 | 4 | 1 | 16 | high |
| 22 | FAST Interbank Payment SystemFinancial ยท Payments & Settlement Systems ยท Phnom Penh | 4 | 4 | 3 | 3 | 2 | 16 | medium |
| 23 | ACLEDA Bank HeadquartersFinancial ยท Banks, Insurers & Systemic Institutions ยท Phnom Penh | 3 | 4 | 3 | 3 | 3 | 16 | high |
| 24 | Cambodia-Laos Power InterconnectionEnergy ยท Transmission & Distribution ยท Stung Treng to Ban Hat | 3 | 5 | 3 | 3 | 2 | 16 | medium |
| 25 | National Road 5 (Phnom Penh-Poipet)Transport ยท Roads & Bridges ยท Northwest corridor | 3 | 3 | 4 | 3 | 2 | 15 | high |