- Assets
- 930of 1,062 records
- Top-100 mean
- 22.35of 25
- Scoring a full 25
- 8
- Leading group
- 18%Financial
Where the top 100 are100 located
A larger circle is a higher score. A fainter one marks the place an asset is in, or a point standing for a network, not the asset's own site.
The shape of the register
How the nation's strategic weight and its assets are spread across the ten capability groups, and how its scores are distributed.
Signature
Each capability group's share of the score carried by the nation's 200 highest-scoring assets.
Transport
Energy
Resource
Financial
Communications & Digital
Space, Aerospace & Defence
Social
Water, Sanitation & Waste
Advanced Manufacturing
Agriculture & Food
16.7%
16.5%
15.9%
13.6%
9.7%
8.3%
7.5%
5.9%
3.8%
2.1%
Assets by capability group
Every discrete asset on the register, and how many of each group reach the national top 100.
Score distribution
The number of assets at each score from 0 to 25.
Source National Infrastructure Index, Strategic Infrastructure schema v1.1. An asset's score is the sum of five dimensions, each judged from 0 to 5; individual scores are approximate.
Not yet or no longer operating: 18 under construction, 21 planned, 8 decommissioned, 7 damaged or idle, 1 inactive.
National top 100
Every asset competes on its score, with no quota by sector. The five dimensions are each judged from 0 to 5.
| # | Asset | Flow | Reach | Centrality | Substitutability | Throughput | Score | Confidence |
|---|---|---|---|---|---|---|---|---|
| 1 | Canadian National RailwayTransport ยท Rail Infrastructure ยท Montreal | 5 | 5 | 5 | 5 | 5 | 25 | high |
| 2 | Athabasca oil sandsResource ยท Oil & Gas Extraction ยท Fort McMurray | 5 | 5 | 5 | 5 | 5 | 25 | high |
| 3 | Bank of CanadaFinancial ยท Currency & Reserves ยท Ottawa | 5 | 5 | 5 | 5 | 5 | 25 | high |
| 4 | La Grande ComplexEnergy ยท Hydropower ยท Radisson | 5 | 5 | 5 | 5 | 5 | 25 | high |
| 5 | CDS Clearing and Depository ServicesFinancial ยท Markets, Exchanges & Depositories ยท Toronto | 5 | 5 | 5 | 5 | 5 | 25 | medium |
| 6 | Enbridge Mainline SystemResource ยท Storage, Transport & Export ยท Edmonton | 5 | 5 | 5 | 5 | 5 | 25 | medium |
| 7 | LynxFinancial ยท Payments & Settlement Systems ยท Ottawa | 5 | 5 | 5 | 5 | 5 | 25 | medium |
| 8 | Government of Canada marketable bond market and auction systemFinancial ยท Markets, Exchanges & Depositories ยท Ottawa | 5 | 5 | 5 | 5 | 5 | 25 | medium |
| 9 | Canada Mortgage and Housing CorporationSocial ยท Housing, Community & Social Services ยท Ottawa | 5 | 4 | 5 | 5 | 5 | 24 | high |
| 10 | St. Lawrence SeawayTransport ยท Inland Waterways & Ferries ยท Cornwall | 5 | 5 | 5 | 5 | 4 | 24 | high |
| 11 | Churchill Falls Generating StationEnergy ยท Hydropower ยท Churchill Falls | 5 | 5 | 5 | 5 | 4 | 24 | high |
| 12 | Trans Mountain PipelineResource ยท Storage, Transport & Export ยท Burnaby | 5 | 5 | 5 | 5 | 4 | 24 | high |
| 13 | Nav CanadaTransport ยท Air Navigation & Traffic Management ยท Ottawa | 5 | 5 | 5 | 5 | 4 | 24 | high |
| 14 | Toronto Pearson International AirportTransport ยท Air Infrastructure ยท Mississauga | 5 | 5 | 5 | 4 | 5 | 24 | high |
| 15 | Port of VancouverTransport ยท Seaports & Terminals ยท Vancouver | 5 | 5 | 5 | 4 | 5 | 24 | high |
| 16 | Toronto Stock ExchangeFinancial ยท Markets, Exchanges & Depositories ยท Toronto | 5 | 5 | 5 | 4 | 5 | 24 | high |
| 17 | Canadian Pacific Kansas CityTransport ยท Rail Infrastructure ยท Calgary | 5 | 5 | 5 | 4 | 5 | 24 | high |
| 18 | Bruce Nuclear Generating StationEnergy ยท Nuclear Generation ยท Tiverton | 5 | 4 | 5 | 5 | 4 | 23 | high |
| 19 | Darlington Nuclear Generating StationEnergy ยท Nuclear Generation ยท Clarington | 5 | 4 | 5 | 5 | 4 | 23 | high |
| 20 | Robert-Bourassa generating stationEnergy ยท Hydropower ยท Radisson | 5 | 4 | 5 | 5 | 4 | 23 | high |
| 21 | W. A. C. Bennett DamEnergy ยท Hydropower ยท Hudson's Hope | 5 | 4 | 5 | 5 | 4 | 23 | high |
| 22 | Nelson River hydroelectric generating stationsEnergy ยท Hydropower ยท Gillam | 5 | 4 | 5 | 5 | 4 | 23 | high |
| 23 | CPKC Kicking Horse Pass and Rogers Pass crossings (Spiral, Connaught and Mount Macdonald tunnels)Transport ยท Rail Infrastructure ยท Field | 5 | 4 | 5 | 5 | 4 | 23 | high |
| 24 | Hydro-Quebec 735 kV transmission networkEnergy ยท Transmission & Distribution ยท Montreal | 5 | 4 | 5 | 5 | 4 | 23 | medium |
| 25 | Receiver General for CanadaFinancial ยท Currency & Reserves ยท Ottawa | 5 | 4 | 5 | 5 | 4 | 23 | medium |