- Assets
- 247of 247 records
- Top-100 mean
- 16.97of 25
- Scoring a full 25
- 0
- Leading group
- 23%Transport
Where the top 100 are81 located
A larger circle is a higher score. A fainter one marks the place an asset is in, or a point standing for a network, not the asset's own site.
The shape of the register
How the nation's strategic weight and its assets are spread across the ten capability groups, and how its scores are distributed.
Signature
Each capability group's share of the score carried by the nation's 200 highest-scoring assets.
Transport
Energy
Social
Financial
Communications & Digital
Space, Aerospace & Defence
Resource
Advanced Manufacturing
Water, Sanitation & Waste
Agriculture & Food
18.1%
14.8%
14.0%
9.9%
9.0%
8.8%
8.5%
6.9%
6.4%
3.7%
Assets by capability group
Every discrete asset on the register, and how many of each group reach the national top 100.
Score distribution
The number of assets at each score from 0 to 25.
Source National Infrastructure Index, Strategic Infrastructure schema v1.1. An asset's score is the sum of five dimensions, each judged from 0 to 5; individual scores are approximate.
Not yet or no longer operating: 10 under construction, 2 planned, 1 damaged or idle, 1 inactive.
National top 100
Every asset competes on its score, with no quota by sector. The five dimensions are each judged from 0 to 5.
| # | Asset | Flow | Reach | Centrality | Substitutability | Throughput | Score | Confidence |
|---|---|---|---|---|---|---|---|---|
| 1 | Transelectrica National Transmission GridEnergy ยท Transmission & Distribution ยท Nationwide, dispatch centre in Bucharest | 5 | 4 | 5 | 5 | 3 | 22 | high |
| 2 | Cernavoda Nuclear Power PlantEnergy ยท Nuclear Generation ยท Cernavoda, Constanta County | 5 | 4 | 5 | 5 | 3 | 22 | high |
| 3 | National Bank of RomaniaFinancial ยท Currency & Reserves ยท Bucharest | 5 | 4 | 5 | 5 | 3 | 22 | high |
| 4 | ReGIS Real Time Gross Settlement SystemFinancial ยท Payments & Settlement Systems ยท Bucharest | 5 | 4 | 5 | 5 | 3 | 22 | high |
| 5 | Transgaz National Gas Transmission System and BRUA PipelineResource ยท Storage, Transport & Export ยท Nationwide, Medias headquarters | 5 | 5 | 5 | 4 | 3 | 22 | medium |
| 6 | Port of ConstantaTransport ยท Seaports & Terminals ยท Constanta | 4 | 5 | 5 | 4 | 4 | 22 | high |
| 7 | Dispecerul Energetic National (National Power Dispatch Centre)Energy ยท System Control & Dispatch ยท Bucharest | 5 | 4 | 5 | 4 | 3 | 21 | high |
| 8 | Henri Coanda International AirportTransport ยท Air Infrastructure ยท Otopeni, Ilfov | 4 | 5 | 5 | 4 | 3 | 21 | high |
| 9 | Iron Gate I Hydroelectric Power StationEnergy ยท Hydropower ยท Danube, Mehedinti County | 4 | 5 | 4 | 5 | 3 | 21 | high |
| 10 | Sulina ChannelTransport ยท Inland Waterways & Ferries ยท Sulina | 4 | 5 | 4 | 5 | 3 | 21 | high |
| 11 | ROMATSA Bucharest Area Control CentreTransport ยท Air Navigation & Traffic Management ยท Bucharest | 4 | 5 | 4 | 5 | 3 | 21 | medium |
| 12 | Mihail Kogalniceanu Air BaseSpace, Aerospace & Defence ยท Military Bases & Installations ยท Constanta County | 4 | 5 | 4 | 4 | 3 | 20 | high |
| 13 | Neptun Deep Offshore Gas Projectunder constructionResource ยท Oil & Gas Extraction ยท Black Sea, offshore Constanta | 4 | 5 | 4 | 4 | 3 | 20 | high |
| 14 | Constanta Grain TerminalsAgriculture & Food ยท Storage, Cold Chain & Markets ยท Port of Constanta | 4 | 5 | 4 | 4 | 3 | 20 | medium |
| 15 | Pitesti Nuclear Fuel PlantEnergy ยท Nuclear Fuel Cycle & Radioactive Waste ยท Mioveni | 4 | 4 | 4 | 5 | 2 | 19 | high |
| 16 | Oil Terminal ConstantaResource ยท Storage, Transport & Export ยท Constanta | 4 | 4 | 4 | 4 | 3 | 19 | high |
| 17 | Petrobrazi RefineryResource ยท Processing & Refining ยท Brazi, Prahova County | 4 | 4 | 4 | 4 | 3 | 19 | high |
| 18 | Conpet National Crude Oil Pipeline SystemResource ยท Storage, Transport & Export ยท Ploiesti | 4 | 4 | 4 | 4 | 3 | 19 | high |
| 19 | TransFonD SENT automated clearing houseFinancial ยท Payments & Settlement Systems ยท Bucharest | 4 | 4 | 4 | 4 | 3 | 19 | high |
| 20 | Nadlac II Border CrossingTransport ยท Logistics, Multimodal & Border Infrastructure ยท Nadlac | 4 | 5 | 4 | 3 | 3 | 19 | high |
| 21 | Iron Gates II Hydroelectric PlantEnergy ยท Hydropower ยท Ostrovu Mare | 4 | 5 | 3 | 4 | 3 | 19 | high |
| 22 | Bucharest Arges Water Supply SystemWater, Sanitation & Waste ยท Water Supply & Treatment ยท Crivina and Arcuda, Ilfov | 4 | 3 | 4 | 4 | 3 | 18 | high |
| 23 | A2 Sun Motorway Bucharest-ConstantaTransport ยท Roads & Bridges ยท Bucharest to Constanta | 4 | 3 | 4 | 4 | 3 | 18 | high |
| 24 | Special Telecommunications Service NetworkCommunications & Digital ยท Core & Backbone Networks ยท Bucharest | 4 | 4 | 4 | 4 | 2 | 18 | medium |
| 25 | Dacia Mioveni Automotive PlantAdvanced Manufacturing ยท Production Systems ยท Mioveni, Arges County | 3 | 4 | 4 | 4 | 3 | 18 | high |