- Assets
- 767of 997 records
- Top-100 mean
- 22.48of 25
- Scoring a full 25
- 8
- Leading group
- 20%Transport
Where the top 100 are100 located
A larger circle is a higher score. A fainter one marks the place an asset is in, or a point standing for a network, not the asset's own site.
The shape of the register
How the nation's strategic weight and its assets are spread across the ten capability groups, and how its scores are distributed.
Signature
Each capability group's share of the score carried by the nation's 200 highest-scoring assets.
Transport
Social
Communications & Digital
Energy
Financial
Space, Aerospace & Defence
Resource
Water, Sanitation & Waste
Agriculture & Food
Advanced Manufacturing
18.8%
14.4%
12.0%
11.8%
10.0%
9.8%
9.5%
8.2%
3.1%
2.4%
Assets by capability group
Every discrete asset on the register, and how many of each group reach the national top 100.
Score distribution
The number of assets at each score from 0 to 25.
Source National Infrastructure Index, Strategic Infrastructure schema v1.1. An asset's score is the sum of five dimensions, each judged from 0 to 5; individual scores are approximate.
Not yet or no longer operating: 6 planned, 5 decommissioned, 16 under construction, 2 inactive, 3 damaged or idle.
National top 100
Every asset competes on its score, with no quota by sector. The five dimensions are each judged from 0 to 5.
| # | Asset | Flow | Reach | Centrality | Substitutability | Throughput | Score | Confidence |
|---|---|---|---|---|---|---|---|---|
| 1 | Ataturk DamWater, Sanitation & Waste ยท Dams, Reservoirs & Flood Defence ยท Bozova | 5 | 5 | 5 | 5 | 5 | 25 | high |
| 2 | Bosphorus (Istanbul Strait)Transport ยท Inland Waterways & Ferries ยท Istanbul | 5 | 5 | 5 | 5 | 5 | 25 | high |
| 3 | Dardanelles (Canakkale Strait)Transport ยท Inland Waterways & Ferries ยท Canakkale | 5 | 5 | 5 | 5 | 5 | 25 | high |
| 4 | Baku-Tbilisi-Ceyhan pipeline and Ceyhan (Haydar Aliyev) marine terminalResource ยท Storage, Transport & Export ยท Ceyhan | 5 | 5 | 5 | 5 | 5 | 25 | high |
| 5 | Borsa IstanbulFinancial ยท Markets, Exchanges & Depositories ยท Istanbul | 5 | 5 | 5 | 5 | 5 | 25 | high |
| 6 | Southeastern Anatolia Project (GAP) irrigation systemAgriculture & Food ยท Irrigation & Agricultural Water ยท Sanliurfa | 5 | 5 | 5 | 5 | 5 | 25 | high |
| 7 | CBRT gold and foreign exchange reservesFinancial ยท Currency & Reserves ยท Ankara | 5 | 5 | 5 | 5 | 5 | 25 | medium |
| 8 | TEIAS national electricity transmission gridEnergy ยท Transmission & Distribution ยท Ankara | 5 | 5 | 5 | 5 | 5 | 25 | medium |
| 9 | Ministry of Treasury and FinanceSocial ยท Government & Public Administration ยท Ankara | 5 | 4 | 5 | 5 | 5 | 24 | high |
| 10 | BOTAS national natural gas transmission gridResource ยท Storage, Transport & Export ยท Ankara | 5 | 4 | 5 | 5 | 5 | 24 | medium |
| 11 | State Hydraulic Works (DSI) national water conveyance systemWater, Sanitation & Waste ยท Bulk Water Transfer & Desalination ยท Ankara | 5 | 4 | 5 | 5 | 5 | 24 | medium |
| 12 | Turkish state highway and motorway network (KGM)Transport ยท Roads & Bridges ยท Ankara | 5 | 4 | 5 | 5 | 5 | 24 | medium |
| 13 | DSI national irrigation networkAgriculture & Food ยท Irrigation & Agricultural Water ยท Ankara | 5 | 4 | 5 | 5 | 5 | 24 | medium |
| 14 | CBRT Electronic Funds Transfer (EFT) systemFinancial ยท Payments & Settlement Systems ยท Ankara | 5 | 4 | 5 | 5 | 5 | 24 | medium |
| 15 | Ilisu DamWater, Sanitation & Waste ยท Dams, Reservoirs & Flood Defence ยท Dargecit | 5 | 5 | 5 | 5 | 4 | 24 | high |
| 16 | DHMI national air navigation systemTransport ยท Air Navigation & Traffic Management ยท Ankara | 5 | 5 | 5 | 5 | 4 | 24 | medium |
| 17 | Istanbul AirportTransport ยท Air Infrastructure ยท Arnavutkoy | 5 | 5 | 5 | 4 | 5 | 24 | high |
| 18 | TurkStream receiving terminal, KiyikoyResource ยท Storage, Transport & Export ยท Kiyikoy | 5 | 5 | 5 | 4 | 5 | 24 | high |
| 19 | Kapikule Border GateTransport ยท Logistics, Multimodal & Border Infrastructure ยท Edirne | 5 | 5 | 5 | 4 | 5 | 24 | high |
| 20 | ISKI Istanbul wastewater collection and treatment systemWater, Sanitation & Waste ยท Wastewater & Sanitation ยท Istanbul | 5 | 3 | 5 | 5 | 5 | 23 | medium |
| 21 | ISKI Istanbul water supply and distribution systemWater, Sanitation & Waste ยท Water Supply & Treatment ยท Istanbul | 5 | 3 | 5 | 5 | 5 | 23 | medium |
| 22 | MarmarayTransport ยท Rail Infrastructure ยท Istanbul | 5 | 4 | 5 | 5 | 4 | 23 | high |
| 23 | Keban DamWater, Sanitation & Waste ยท Dams, Reservoirs & Flood Defence ยท Keban | 5 | 4 | 5 | 5 | 4 | 23 | high |
| 24 | Presidential Complex, BestepeSocial ยท Government & Public Administration ยท Bestepe | 5 | 4 | 5 | 5 | 4 | 23 | high |
| 25 | Turkish Aerospace Industries Kahramankazan complexSpace, Aerospace & Defence ยท Manufacturing Facilities ยท Kahramankazan, Ankara | 5 | 4 | 5 | 5 | 4 | 23 | high |